Manufacturing Process for Aluminum Ceiling Panels
1. Laminating is a physical process that involves applying a layer of film to an aluminum sheet using high temperature and high pressure. This process offers smoke resistance: the high-PVC film produced by this method is easy to clean.
① Abrasion resistance: The unique PET layer is extremely sturdy and durable.
② Moisture resistance: The surface coating reduces direct contact between water and the aluminum, ensuring high durability.
③ Pleasant texture: The smooth surface layer feels comfortable to the touch and does not cause any discomfort.
④ Available in a variety of colors at a moderate price, offering good overall value for money.
2. Coating Process: This process utilizes high-quality, internationally standardized hot-rolled aluminum alloy substrates and involves a “three-coat, three-bake” process in the roller coating zone. This treatment is healthy and environmentally friendly, using aluminum substrates that comply with international standards and are free of harmful metals such as chromium and lead, meeting EU and international standards. It employs advanced technology to provide corrosion resistance and oil resistance. It is rot-resistant and maintains long-lasting color fastness.
3. The anodizing treatment process is healthy and environmentally friendly, offering scratch resistance, wear resistance, fingerprint resistance, corrosion resistance, and antistatic properties. It does not easily attract dust, is easy to clean, and comes in a wide variety of colors.
Installation Steps for Aluminum Ceiling Tiles
The installation process for aluminum ceiling tiles generally involves using specialized battens. These battens are made of galvanized steel or powder-coated steel, with a standard length of 3,000 mm.
1. Install the edge trim series at the same horizontal level.
2.
Hang the light-gauge steel studs (38 or 50 series) at appropriate intervals, typically 1–1.2 meters apart, with suspension rods spaced according to specifications for light-gauge steel studs.
3.
Attach the pre-installed mounting brackets on the panel battens, along with the battens themselves, so that they lie flush against the light-gauge steel studs and are secured vertically beneath them. The spacing between panel battens is generally 1 meter. After complete installation, the level must be adjusted. (Generally, when the vertical distance between the building structure and the aluminum panels to be installed does not exceed 600 mm, there is no need to add intermediate 38 or 50 battens; instead, the panel mounting brackets are connected directly to the suspension rods).
4.
Install the panel strips in sequence, placing them side by side and parallel to each other on the corresponding studs. Connect the panel strips using specialized connectors from the stud series.
5. Gloves must be worn during panel installation. If fingerprints or stains are accidentally left on the surface, they can be cleaned with dish soap and hot water, then wiped dry. Proper installation techniques ensure easy disassembly.